Evergreen Line free time at Antwerp-Bruges

BEANR · Belgium. Certified Pick-up release delays are terminal-side and are a strong ground to strip demurrage days.

Evergreen Line · Antwerp-Bruges · 40' dry (GP) · import

Typical filing
Demurrage free days
5
Box inside the terminal
Detention free days
5
Equipment outside the terminal
Day counting
Calendar days
Weekends included
Demurrage clock starts
Discharge.
Detention clock starts
Gate-out.
Weekend & holiday policy
Calendar days; a minority of filings exclude Belgian public holidays.

Escalation after free time

BandChargeable daysRelative daily rate
Tier 11–51×
Tier 26–122×
Tier 3+13+3×

Bands are relative multipliers of the first chargeable day, not dollar rates — per-diem amounts are contract- and lane-specific. Use the carrier lookup below for the filed figure.

Enter the discharge / availability date and we count the free period the way this port counts it.

Before you quote — watch for

  • Evergreen filings escalate steeply after the first band — day 8 can cost triple day 4.
  • Certified Pick-up release delays are terminal-side and are a strong ground to strip demurrage days.

Derived from the carrier’s published tariff structure plus the prevailing local norm for this port. Your service contract overrides it. Evergreen local tariff pages

Know the exact date, not just the free days

Enter your discharge date for Evergreen Line at Antwerp-Bruges and get the dated last free day plus per-day exposure — and a free email reminder three days out, one day out and the day it expires.

Last Free Day calculator

Other carriers at Antwerp-Bruges (40' dry (GP), import)

Demurrage exposure calculatorFree invoice audit
Lane brief

Get your last free day and the filed-tariff citation by email.

Free days for this lane, the terminal clock that runs alongside it, and the exact wording to quote back to the carrier.

One email · no signup · unsubscribe in one click