Maersk · Los Angeles / Long Beach · 40' dry (GP) · import

Typical filing
Demurrage free days
4
Box inside the terminal
Detention free days
4
Equipment outside the terminal
Day counting
Calendar days
Weekends included
Demurrage clock starts
Discharge of the container from the vessel (some filings start the following day).
Detention clock starts
Gate-out of the loaded container from the terminal.
Weekend & holiday policy
Calendar days including weekends; most filings exclude the day of discharge itself.

Escalation after free time

BandChargeable daysRelative daily rate
Tier 11–51×
Tier 26–101.8×
Tier 3+11+2.6×

Bands are relative multipliers of the first chargeable day, not dollar rates — per-diem amounts are contract- and lane-specific. Use the carrier lookup below for the filed figure.

Enter the discharge / availability date and we count the free period the way this port counts it.

Before you quote — watch for

  • Merged "D&D" lines hide which clock produced the charge — always demand the split before paying.
  • Appointment scarcity is the top reversal ground here: days when no dual-transaction slot existed are not merchant-caused under the FMC rule.
  • US import: the FMC rule (46 CFR 541) requires the charge to serve an incentive purpose and the invoice to carry 13 specific elements. A defective invoice eliminates the obligation to pay.

Derived from the carrier’s published tariff structure plus the prevailing local norm for this port. Your service contract overrides it. Maersk Local Information — D&D lookup

CSV & API export — Matrix plan, $99/mo